The 1-10-100 rule is a quality management concept that’s been around for a long time, and it’s a shorthand for what a defect costs at each stage. Preventing a problem costs one unit. Fixing it before it leaves your hands costs ten. Dealing with it after it fails costs a hundred.

Julie Stiglish, a master electrician and the founder of a consulting firm focused on utility-scale solar quality, says that on a solar site that multiplier can be much worse. In this clip, she explains why, and it comes down to three things: repetition, access, and time. A defect in a process gets repeated thousands of times, the site is remote and energized, and the plant has decades to run with a flaw nobody has found.

You can see what that looks like in practice in Julie’s free course, 10 Utility-Scale Solar Defects Hiding in Plain Sight. It takes the same defect from a $2 fix at installation to a $2 million problem in operation, using ten annotated photos. It takes about an hour and it’s free, so be sure to enroll today!

Transcript below.

You talk about the 1-10-100 rule in the course. Where does that concept come from, and why does it hit differently with utility-scale solar than in other industries?

That’s another really good question. If you’re not in quality, you may not know where this concept comes from, but it’s been in the quality management industry for quite a long time. The idea is that preventing a problem costs one, like the number one, so there’s a fixed number associated with that. Fixing it before it leaves your hands costs 10, and dealing with it after it fails costs 100. So we apply that as a multiplier: one times the cost, 10 times the cost, and then 100 times the cost.

In utility-scale solar, the multiplier can be much worse, for three reasons.

The first reason is repetition. A defect in a process isn’t just one defect. If we have one team that’s installing, and they’re installing thousands, then we can expect a much larger sampling size as it gets down the road. So it’s that defect times thousands of identical installations.

The second is access. These sites are huge, they’re remote, and they’re energized. Remember, these are utility-scale solar sites, so they’re connected to a utility that’s helping supply the grid.

And then the third is time. Plants are built to run for decades, 30 years, 35 years. I’ve seen 40-year PPAs now. So a latent defect has a really long runway to cause damage. Something you see that you can fix when it costs $1 in utility-scale solar can actually get into the millions once it’s caused damage in year six or 10.

Want to see how Julie builds a quality system around this cost curve? Check out Julie’s in-depth Utility-Scale Solar QA/QC Fundamentals course.

Brit Heller
Written by

Brit Heller

Director of Program Management @ HeatSpring. Brit holds two NABCEP certifications - Photovoltaic Installation Professional (PVIP) and Photovoltaic Technical Sales (PVTS). When she isn’t immersed in training, Brit is a budding regenerative farmer just outside of Atlanta where she is developing a 17-acre farm rooted in permaculture principles. She can be found building soil health, cultivating edible & medicinal plants, caring for her animals or building functional art.