Finance 101 for Solar Thermal Pros

In this article, I’ll go through the basic step-by-step process of how to evaluate, understand and communicate the financial benefits of investing in a solar thermal system. The analysis will be on the client side, but obviously it’s critical for sales as well.
Before you read: get familiar with financial terms and analysis, you should read the first article in the series “Finance 101 for Renewable Energy Pros”. Also, it’s important to note that I’m using the word “finance” as a way to build financial models, understand the economic drivers and benefits of specific  technology – not finance as in ‘we financed our car instead of paying cash’.

Here are the other articles in this series:

 Finance 101 for RE Pros
Finance 101 for PV Pros
Finance 101 for Geo Pros

We’ll be going through the same drill that I did with solar PV and geothermal in terms of the outline but the specific content will be tailored to the technology that we’re looking at, solar thermal.

Here’s the outline

What makes SHW special and a little different then analyzing other technologies
Step 1. Estimating solar thermal load, array size and power production
Step 2. Gross and net installed costs
Step 3. Determine the value of a SHW BTU
Step 4. Estimating operations and maintenance costs
Step 5. A few examples IRRs and sensitivity analysis for residential and commercial projects based on 1) load 2) fuel source 3) site characteristics
Marketing Implications
What I did not address that could be investigated.

A few issues around the difficulties and issues with determining the exact NPV of a SHW system. 

On residential applications, it’s too costly to figure out exactly how much hot water is being used. Thus, we use assumptions that frankly, are not very accurate. See the Canadian study that found out the average of 65 gallons used per day, was actually around 44.
Unless the hot water generator is the only fuel source of that specific kind, it’s difficult to estimate on residential applications and mainly based on assumptions, which can be very wrong.
On commercial applications, it is common to use ultrasonic BTU meters for a week or so to understand exactly how much water is being used. However, it’s still key to understand daily and yearly usage patterns. For example, if a laundromat is used heavily in the morning or a college dormitory is not used during the summer that will have implications for the value of the heat the solar thermal system is creating. See point 2.
Production and usage of solar thermal energy are not equal. A property owner only gets the value of a solar BTU when they’re using water that is getting preheated by a solar thermal system. If they’re not using water, and the solar thermal system is producing that energy gets lost. Not all of it is lost, because the storage tank is able to hold a lot of water but they can’t hold it forever. The reason this is important for financial modeling is because, UNLIKE SOLAR PV, just because the solar thermal modules produce power doesn’t mean it was used and thus doesn’t mean the financial benefit was realized. The classic example is a family that goes on vacation for 2 weeks, if it’s a pressurized solar thermal system (we’re not going to get into pressurized vs drawback in this article and the design and financial implications of each) the pump will likely still cycle and energy will be produced, but nothing will be used. From a finance perspective, nothing is gained, only lost in the power the pump needed to run.
Quoted prices for solar thermal systems can vary widely from site to site and between geographic regions. The main drivers between sites will likely be 1) structural support needed. All else equal pitched shingle roofs are cheaper then flat roofs. 2) If a storage tank is required. For buildings that have a constant load 365, storage is typically not required. Pool heating is a good example. This will decrease installed costs. Between geographic regions that main drivers of costs tend to be the training of the crew. Almost all of the parts are off the shelf, or close to it, so it’s difficult to get better pricing on equipment, however a crew’s ability to executive and their level of training will be different between regions.
Module output is based on more factors then in solar PV. In a solar PV product output is mainly based on 1) the solar resource available 2) orientation of the module 3) efficiency of the module 4) temperature. With solar thermal, all of those factors also apply IN ADDITION to the load profile of the building. Why? The higher the load of the building the colder the water will tend to be, all else equal, when entering the solar therm module. This will increase heat exchange. So for example, if the modules were 180 degrees, the water passing through them will collect more BTUs if it enter the modules at 50, then if it entered the modules at 100. What this means is that if we installed 10 modules on a building with a load of X, if the same number of modules were installed on a building and the load was 2X, the production of the modules would be much higher. For this reason, it’s a good idea to keep the solar fraction low in a design, to maximize the BTU production of each module. How low? Dr. Ben suggestions between around 30% and 60%, see his great explanation of the subject here.
Maintenance costs can vary widely based on the type of system, equipment used, equipment warranties, and what the type of system is connected to. Also, because the solar thermal industry is relatively small, I haven’t been able to find large data sets of warranty information that I can be confident in.

[…]

Jigar Shah’s Call to Arms For Small Solar Companies Everywhere

This week I flew to Chicago for the Illinois Solar Energy Association fund raiser.  Jigar Shah delivered the keynote to 70 registrants, packed into Emmett’s Place in Palatine.  I left at 9:30pm with an excited sense that Solar PV in Illinois is going to take off.

This was my second Jigar Shah presentation, (here is my […]

Solar Financing Options and the Benefits of Each

The residential, commercial and utility scale solar financing markets are different and have their own dynamics.
If you’re really interested in learn more about financing commercial solar PV projects, I have three resources for you.

Click here to sign up for our Solar Executive MBA and Learn how to Finance Commercial Solar PPAs from A to Z
Check out our Mastering Commercial Solar Finance course and get hours of expert instruction, advice from a $20MM solar tax equity investor, and a downloadable guide for just $29!
Check out Solar Action Alliance to learn more about the most bountiful and powerful energy source on earth: the sun.

The residential market is driven by 3rd party PPA providers and companies offering their own in-house financing. For example, 3rd party providers include SunRun and BrightGrid , as well as companies offering their own in-house financing, like SolarCity. The 3rd party companies provide a useful tool because it allows smaller companies to compete with the larger SolarCity types by allowing them to offer competitive financing. Each of these companies has been able to tap into large amounts of institutional capital by providing stable returns.

The utility market (20MW+) on the other hand, is very concentrated and is typically dominated by manufacturers who create or buy their own development department. In the SEIA’s last report 51% of the utility market was dominated by only 12 firms. As you can see from the list of top utility solar developers below most are manufacturers, and the majority of the independent developers, like Recurrent Energy, have been bought by manufactures. Recurrent was recently acquired by Sharp last year.

The commercial market in the built environment is a different environment from both utility and residential scale, as it requires a more technical understanding of solar, structural and roofing of the building then residential but is also heavily dependent on financing.

[…]

Designing a “Sellable” Solar (or Geothermal) Company – Part 2

In my last post, I wrote about my marketing plan for starting a renewable energy company that will be an offshoot of an existing construction company in the great state of Maine. Now, I’m going to discuss how we’ll be setting up the marketing and sales engine that will drive the businesses. Some have asked if I’m nervous about posting this information (as if I’m giving away some sort of “trade secrets”). My answer is absolutely not. Not only do I think it can help other solar and geothermal contractors dealing with similar issues but if anything it will help me more. Writing down the plan down forces me to focus the idea and ask myself if it makes sense.

In this article I will discuss how I plan on creating the processes and metrics necessary to optimize the marketing, sales, design and installation process of a new company that will sell geothermal, solar pv, solar thermal products. Read below for the full article and if you have any questions or comments on the article please feel free to leave them in the comment section, email me at cwilliams@heatspring.com or ask a question on HeatSpring’s facebook page: http://www.facebook.com/heatspring. Enjoy!

[…]

August 22nd, 2011|Categories: Solar|Tags: , , , , , |

The Solar Interconnection Process 101

The “interconnection process” is the processes by which an electric generating facility (solar, wind, biomass, coal, etc) is allowed to connect to and supply the grid with power. The interconnection process is sometimes overlooked by new solar companies but it’s very important to understand for the health of your business. Similar to the permitting processes with solar, it can be a major obstacles to getting a project completed on time on getting paid, especially as your projects get larger but even for residential work.

The two key questions to address when looking to understand the interconnection is: what is the process and do we do it quickly and efficiently?

For this article, I’m going to focus on the interconnection process for distributed generation solar power planets, that is solar facilites that are 1MW or less. If the facility is larger then 1MW it must go through the standard ISO New England and ISO New England Reliability Pool and might also need to register for FERC if its a “qualifying facility”, meaning the owner is a independent power producer. We’ll save the ISO New England Standard Registration Process for large facilities over 1MW. The variables determing which interconnection process you will go through are based on 1) the size of the plant and 2) the specific location of the interconnection and where it will tie into the grid. Read below for the full article, if have more questions about the interesting process, leave a comment or ask us on the HeatSpring facebook page.

[…]